How Can We Help?
You are here:
< Back

Jin'anqiao station[1] (simplified Chinese: 金安桥站; traditional Chinese: 金安橋站; pinyin: Jīn'ānqiáo zhàn, also known as JIN'ANQIAO station or Jin'an Qiao station) is an interchange station on Line 6, Line 11 and Line S1 of the Beijing Subway.

The Line S1 station opened on December 30, 2017,[2] and was the eastern terminus of Line S1 until the opening of Pingguoyuan on December 31, 2021. The Line 6 station was opened on December 30, 2018,[3] and is the western terminus of Line 6. The Line 11 station opened on December 31, 2021, and was the northern terminus of Line 11 until the opening of Moshikou on December 30, 2023.[4]

The Line 6 station and the Line 11 station are underground. The Line S1 station is elevated.

Station layout

The line 6 station has an underground island platform. The line 11 station has an underground island platform. The Line S1 station has 2 elevated side platforms.

Exits

There are 9 exits, lettered A, B, C, D, E, F, H, J and K. Exits A, B, C, F, H and J are accessible.

References

  1. ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 31 December 2021. Retrieved 31 December 2021.
  2. ^ 三条地铁新线12月30日开通 公交优化调整接驳新地铁. Retrieved 29 December 2017.
  3. ^ http://news.ynet.com/2018/12/30/1600990t70.html[permanent dead link]
  4. ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 29 December 2023. Retrieved 29 December 2023. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
Categories
Table of Contents