How Can We Help?
< Back

Central Silk Board is an upcoming important elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line[1] of Namma Metro in Bangalore, India. This metro station serves the Central Silk Board area.

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations [2][3][4][5][6] (under Blue Line, around 2026).

Station layout

Station Layout (TBC)

Central Silk Board track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Bommanahalli
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road next station is BTM Layout
Side platform | Doors will open on the left Disabled access
L2

Blue Line - Station Layout - To Be Confirmed

Central Silk Board track layout (TBC)
P#
P#
to Train Terminates Here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Krishnarajapura / KIAL Terminals next station is HSR Layout
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

Categories
Table of Contents