The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007.[3] The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.[4]

See also

References

  1. ^ "CFRD practice in Turkey". International Water Power and Dam Construction. 17 April 2007. Archived from the original on 5 June 2012. Retrieved 19 November 2011.
  2. ^ "TORUL DAM and HES PROJECT" (in Turkish). Özdemir İnşaat. Retrieved 19 November 2011.
  3. ^ "Dam, the water began to be kept Torul" (in Turkish). Haberler. Retrieved 19 November 2011.
  4. ^ "Hydroelectric Power Plants in Northern Turkey". IndustCards. Archived from the original on 3 January 2013. Retrieved 19 November 2011.