Hadyard Hill Wind Farm is located in Carrick district of South Ayrshire. Costing £85 million, the wind farm consists of 52 three-bladed Siemens wind turbines, each capable of generating 2.3 megawatts (MW) of power, giving a total output of 120 MW. This was Britain's most powerful wind farm when it was commissioned in March 2006.[1]

The diameter of the blades is 80 metres (262 feet) and each turbine is mounted on tubular steel towers. The wind farm includes three permanent 60 metres (197-feet) high anemometer towers to monitor wind speeds, and is connected by a high-voltage overhead transmission line, which connects to the national electricity network at Maybole.[1]

The farm is operated by Scottish and Southern Energy Generation Ltd.[1]