How Can We Help?
You are here:
< Back

Goyder South Wind Farm is the first stage of the Goyder Renewables Zone development near Burra, South Australia. The Goyder South Wind Farm will be on the hills south-east of the town of Burra.

Early construction works for stage 1 began in December 2021. The project is owned by Neoen and the construction contract was awarded to a consortium of GE Renewable Energy and Elecnor.[1]

Generation capacity of stage 1 is anticipated to be 412MW. The Government of the Australian Capital Territory has signed a 14-year contract for 100MW of electricity from 1A, and the Olympic Dam mine signed a contract for 1B.[2] Generation will be from 75 GE 5.5-158 Cypress wind turbines. It will have a new transmission line to connect to the Robertstown substation. First power came online in April 2024,[3] and the facility is expected to be operational in 2024.[1]

The Goyder South Wind Farm proposal has replaced the 119 MW Stony Gap Wind Farm which had been proposed for the same area, originally by EnergyAustralia[4] who sold it to Palisade Investment Partners in 2017[5] before Neoen bought the proposal in September 2019 and included it in the larger plan.[6]

References

Categories
Table of Contents