How Can We Help?
You are here:
< Back
Line 9 drawn to scale.

Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a metro line in Hangzhou. The line is 29.45 km (18.30 mi) long and runs in a north–south direction between Guanyintang and Long'an.[1] The line is colored brown on system maps.

Opening timeline

Segment Commencement Length Station(s) Name
Coach Center — Linping 24 November 2012; 11 years ago (2012-11-24)[a]
10 July 2021; 2 years ago (2021-07-10)[b]
12.5 km (7.8 mi)[3] 7 Central section of Phase 1
Linping — Long'an 17 September 2021; 2 years ago (2021-09-17)[4] 6.2 km (3.9 mi)[5] 4 North section of Phase 1
Guanyintang — Coach Center
(except Liubao and Wubao)
1 April 2022; 2 years ago (2022-04-01)[6][7] 12 km (7.5 mi)[6] 10 South section of Phase 1
Liubao and Wubao 14 December 2022; 17 months ago (2022-12-14)[8] 2 Infill stations
  1. ^ as part of Line 1
  2. ^ Line 9 commencement[2]

Stations

Legend

  - Operational
  - Under construction

Section Station name[1] Connections Distance
km
Location
English Chinese
North Long'an 龙安 0 0 Linping
Wuzhou Road 五洲路
Heyu Road 荷禹路
Qiushan Avenue 邱山大街
Central Linping 临平
Nanyuan 南苑
Linpingnan Railway Station 临平南高铁站  Hanghai 
Linpingnan railway station EVH
Wengmei 翁梅
Qiaosi 乔司
South Qiaosi 乔司南
Coach Center 客运中心  1  Shangcheng
South Jiumu Road 九睦路
South Hongpu Road 红普南路
Liubao 六堡
Wubao 五堡
Yudao 御道  19 
Sanbao 三堡  6 
Jianghehui 江河汇
Qianjiang Road 钱江路  2   4 
Xinye Road 新业路
Guanyintang 观音塘  7 

See also

References

Categories
Table of Contents