Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as part of Line 7.[2] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.

It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]

Stations

Station name[4] Connections Distance
km
Location
English Chinese
Moyang 莫阳 - 0 Xiangcheng
Zhujing 朱泾
Suzhou North Railway Station 高铁苏州北站  2 
Xuenan 雪南
Changlou 常楼
Dengyun 登云
Litanghelu 蠡塘河路
Chunshenhudonglu 春申湖东路
Huayuanlu East 华元路东
Baidang North 白荡北  8 
Baidang South 白荡南 SIP
Banjing 板泾
Yangjing 洋泾
Jicuiqiao 积翠桥
Central Park 中央公园  1 
Reyunqiao 惹云桥  6 
Huangtiandang 黄天荡  5 
Loufeng 娄葑
Qunli 群力
Tongyuanlu South 通园路南  3 
Linjiatan 林家潭 Wuzhong
Guoxiang 郭巷  2 
Yinshan 尹山
Jinjiaqiao South 金家桥南
Fengjinlu 枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

References

  1. ^ a b "苏州轨道交通7号线开工建设". 2019-12-25.
  2. ^ "苏州轨道交通". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[dead link]
  3. ^ 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  4. ^ "官宣!苏州轨道交通6、7、8号线车站站名定了". 2024-01-24.