Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a metro line in Hangzhou.[2][3] The line will be 47.48 km long and will run in a west–east direction between Wushan Square station in Shangcheng District and Jiangdong'er Road station in Qiantang District in the east,[4] passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The section between Olympic Sports Center Station and Jiangdong'er Road Station was opened on 30 December 2020,[5] the remaining section opened on 1 April 2022.

Opening timeline

Segment Commencement Length Station(s) Name
Olympic Sports Center — Jiangdong'er Road 30 December 2020 39.62 km 19 Initial Section of Phase 1
Olympic Sports Center — Citizen Center 17 September 2021[6] 3 km[6] 1 Central Section of Phase 1
Citizen Center — Wushan Square
(except Moyetang)
1 April 2022[7][8] 6 km[7] 4 Remaining Section of Phase 1
Moyetang 22 April 2022 - 1 Infill station

Stations

Legend

  - Operational
  - Under construction

Station name Connections Distance
km
Location Opening date
English Chinese
Wushan Square 吴山广场 0 0 Shangcheng 1 April 2022[8]
Jiangcheng Road 江城路  5 
Moyetang 莫邪塘 22 April 2022
Guanyintang 观音塘  9  1 April 2022[8]
Citizen Center 市民中心  4  17 September 2021[6]
Olympic Sports Center 奥体中心  6  Binjiang 30 December 2020
Xingyi 兴议 Xiaoshan
Mingxing Road 明星路
Jianshesan Road 建设三路  2 
Xinxing Road 新兴路
Xinhan Road 新汉路
Xinjie 新街
Hehuan Road 合欢路
Yingzhong 盈中
Kanshan 坎山
Xingang 新港
Xiaoshan International Airport 萧山国际机场  1   19  Hangzhou Xiaoshan International Airport HGH
Yongsheng Road 永盛路  19 
Xinzhen Road 新镇路 Qiantang
Yipeng 义蓬
Tangxinxian 塘新线
Middle Qingliu Road 青六中路  8 
Qicheng Road 启成路
Jiangdong'er Road 江东二路