How Can We Help?
You are here:
< Back

Line 6 of the Fuzhou Metro (simplified Chinese: 福州地铁6号线; traditional Chinese: 福州地鐵6號線; pinyin: Fúzhōu Dìtiě Liù Hào Xiàn) runs from Cangshan District to Changle District. Line 6's color is blue. Phase 1 of the line opened on 28 August 2022.[2]

Sections

Phase 1

Phase 1 of Line 6 starts at Pandun station and ends at Wanshou station. The total length is 31.346 km. There are 16 stations in the section, including 1 elevated station and 15 underground stations.[1] Construction began at the end of 2016.[3] Phase 1 of the line opened on 28 August 2022.[2]

Phase 2

Phase 2 extension to Shibakongzha station is under construction.

Stations

Station name Transfer Distance
km
Location Section
English Chinese
Pandun 潘墩 Cangshan Phase 1
Linpu 林浦  4 
Zhanglan 樟岚
Liangcuo 梁厝  1 
Xiayang 下洋  1 
Yingqian 营前 Changle
Hangcheng 航城
Zhenghe 郑和
Shiyang 十洋
Wuhang 吴航
Heshang 鹤上
Shajing 沙京
Lianhua 莲花
Xiawu 下吴
Hujing 壶井
Wanshou 万寿
Wansha / Fuzhou No.3 High School Binhai Campus 万沙·滨海三中 Phase 2
Binhai CBD 滨海中央商务区  F1 
Shawei 沙尾
Wenwusha / International School 文武砂·国际学校
Shibakongzha 十八孔闸

See also

References

  1. ^ a b "重大进展!福州地铁6号线要来了!". 2022-07-30. 6号线起于潘墩站,止于万寿站,全长约31.346公里,设16个站,其中高架站1座,地下站15座
  2. ^ a b "福州地铁6号线28日正式开通!".
  3. ^ 福州地铁6号线启动社会风险评估公示 有望于年底开工 (in Chinese). China Road Mecine Network. 19 August 2015. Retrieved 2015-01-04.

External links

Categories
Table of Contents