Jitang Station (Chinese: 姬堂站; pinyin: Jītáng Zhàn; Jyutping: gei1tong4 zaam6) is a station of Guangzhou Metro Line 7, located underground at the fork of Fengle North Road, Jitang Changqing Street and Changsheng Street in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

History

The station was handed over to the '3 Powers' on 31 October 2023 for territorial management and operation of the station and facilities.[3]

Station information

G Street level Exits A, B, D, E
L1
Concourse
Lobby Customer Service, Shops, Vending Machines, ATMs
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Dashadong)
Island platform, doors will open on the left
Platform 1  7  towards Yanshan (Jiazhuang) arrow for R
Exit number Exit location
Exit A Fengle North Road
Exit B Fengle North Road
Exit D Fengle North Road
Exit E Fengle North Road

[1]

Future development

The station is planned to have an interchange with Line 19.[4]

Gallery

References

  1. ^ a b "姬堂". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
  2. ^ "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通". 新快报 (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.
  3. ^ "城轨分公司广州地铁七号线二期项目 顺利完成"三权移交"". 中铁四局集团城市轨道交通工程分公司 (in Simplified Chinese). 2023-11-15. Archived from the original on 2023-11-16. Retrieved 2024-01-05.
  4. ^ 李天研 (2018-04-03). "地铁28号线、19号线规划曝光,广佛将有10条地铁线互通". 新浪新闻 (in Simplified Chinese). Archived from the original on 2023-01-22. Retrieved 2024-01-05.