How Can We Help?
You are here:
< Back

Biocon Hebbagodi (formerly known as Hebbagodi) is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburb.

In 2020, Biocon Group signed an agreement with the Bangalore Metro Rail Corporation Ltd to contribute 65 crore towards the construction of the metro station and donated land worth 30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.[1][2]

This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [3][4][5][6][7]

Station layout

Station Layout (TBC)

Biocon Hebbagodi track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Huskur Road
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

See also

References


External links

Categories
Table of Contents