How Can We Help?
You are here:
< Back

Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is a station on Line 6 of the Beijing Subway.[1] This station opened on December 30, 2012.[2][3]

Station layout

The station has an underground island platform.

Exits

There are 4 exits, lettered A, B, D1, and D2. Exit D1 is accessible.

References

  1. ^ "地铁6号线一期沿线站名确定-北京网交通出行". Archived from the original on 2013-12-24. Retrieved 2013-03-19.
  2. ^ "轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 - 要闻速递 - 北京市交通委员会". Archived from the original on 2012-11-11. Retrieved 2012-12-26.
  3. ^ 北京四地铁线30日开通 首末车时间确定 (in Simplified Chinese). 新京报. Retrieved 26 December 2012.

External links

39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657


Categories
Table of Contents