How Can We Help?
You are here:
< Back
Dam in İspir, Erzurum Province
The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) (11.92 MW) and the other downstream (225 MW) in Artvin Province.[1][3]
See also
- Yusufeli Dam – under construction downstream
References
- ^ a b Sucu, Sezai. "Çoruh Basin Projects" (PDF) (in Turkish). State Hydraulic Works. Archived from the original (PDF) on 22 February 2014. Retrieved 7 May 2013.
- ^ "Introductory File For Capacity Increase Within Arkun Dam and HEPP" (PDF). Dolsar. November 2010. Archived from the original (PDF) on 21 February 2014. Retrieved 7 May 2013.
- ^ "As arkun Dam and HEPP was completed in a short period of 4 years" (in Turkish). State Hydraulic Works. 18 June 2014. Retrieved 25 February 2016.
Nuclear | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Renewable energy |
| ||||||||||
Fossil |
| ||||||||||
Power stations projected or under construction in italics |
Categories
-
Annuals36
-
Bulbs, Corms & Tubers41
-
Ferns27
-
Fruits3
-
Garden Plants23
-
Grasses26
-
Herb17
-
Insects1
-
Mammals1
-
Midwest Native Plants0
-
Northeast Native Plants112
-
Perennials123
-
Rose1
-
Shrubs47
-
Trees112
-
Tropical Plants53
-
Upland Birds5
-
Vines18
-
Viola Tricolor1
-
Water Gardening & Plants9
-
Waterfowl0
-
Wetland Birds0
-
Wetland Plants4
-
Wildbirds172
-
Wildflowers1
-
Woodland Plants29
Table of Contents
Recent Comments