Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations.[2][3][4][5][6]

Station layout

Rashtreeya Vidyalaya Road track layout
P1
P2
Station with two tracks and two side platforms
Rashtreeya Vidyalaya Road track layout **
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
**(Upcoming and TBC)
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Banashankari
Platform 1
Northbound
Towards ← Nagasandra next station is Jayanagar
Island platform | P1 & P# doors will open on the left Disabled access
Yellow Line Station Layout & Platform Numbers - (TBC)
Platform #
Southbound
Towards → Bommasandra next station is Ragigudda
Platform #
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Jayanagar 5th Block side
  • Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility

See also

References

  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.


Categories
Table of Contents